The membrane structure project of Shanghai Maya Water Park phase II, located at No. 888 linhu Road, Songjiang District, Shanghai, mainly functions as leisure and landscape, with a total area of 12060 square meters. The membrane structure material of the playing area is mesh membrane with double-sided spray painting, covering an area of 3807 square meters.Dressing room membrane structure membrane material is coated with self-cleaning PVDF coating on the surface, covering an area of 3,553 square meters. Entertainment area membrane structure membrane material is coated with self-cleaning PVDF coating on the surface, covering an area of 4,688 square meters.This model is arranged in the water park, beautiful and smart.

The project main characteristic is that the structure for the space tensioned flexible membrane structure, installation for more than 20 meters high altitude, diaphragm quantity is various, different shape, the boundary of the diaphragm to pull the chain installation trival, interconnected between the diaphragm, the construction precision demand is higher, the conventional steel structure hoisting installation method is difficult to meet the requirements of membrane structure on its precision, and laborious, so the proposed more advanced way of whole hydraulic lifting installation.

Get A Free Consultation

Get a free tensile membrane structure consultation with the most experienced designers and engineers in the industry.